Implementation Tracker

The National Agreement on Closing the Gap includes commitments from the Commonwealth government, all State and Territory governments, the Australian Local Government Association (ALGA) and the Coalition of Peaks to work in partnership towards Closing the Gap.

The Implementation Tracker shows progress for each Party to the National Agreement on delivering against these commitments. Any Joint Council agreed changes to the timeframes for delivery of commitments in the National Agreement are reflected in the comments in the Implementation Tracker.

The chart below is a dynamic representation of progress made in achieving agreed commitments – all commitments are hyperlinked to the corresponding clause in the National Agreement.

Status key:
Complete
Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Delayed
Commitment not delivered in timeframe in National Agreement
Not Yet Reportable
Due date for commitment has not yet arrived. Work may have started but the action is not yet due.
Commitment
Type of Commitment
Jurisdiction
Commitment Clause Due Date Type Responsible Party Jurisdiction Status Comments
Publish National trajectories for each numeric target 88 July 2020 Target All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Publish Available Baseline Data for each state and territory 89 July 2020 Target All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Develop target for reducing family violence 87a October 2020 Target All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Develop target for access to information 87a October 2020 Target All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Develop ongoing Joint Communications Strategy 134 January 2021 Plan,
Strategy
All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Develop a target for inland waters 87b July 2021 Target All parties ALGA Commitment not delivered in timeframe in National Agreement

An initial target was agreed at Joint Council in August 2022. Parties have agreed that further work is required and are working to ensure a clear plan towards a new Inland Waters Target.

Australian Capital Territory Commitment not delivered in timeframe in National Agreement

On 5 July 2024, Joint Council agreed to a jurisdictional approach in developing the Inland Waters Target (instead of a national target). Jurisdictional governments will work in partnership and shared decision making with Aboriginal and Torres Strait Islander Peoples to determine a baseline and their approach to achieving their Inland Waters Target/s.

Coalition of Peaks Commitment not delivered in timeframe in National Agreement

An initial target was agreed at Joint Council in August 2022. Parties have agreed that further work is required and are working to ensure a clear plan towards a new Inland Waters Target.

Commonwealth Commitment not delivered in timeframe in National Agreement

An initial target was agreed at Joint Council in August 2022. Parties have agreed that further work is required and are working to ensure a clear plan towards a new Inland Waters Target.

New South Wales Commitment not delivered in timeframe in National Agreement

On 5 July 2024, Joint Council agreed to a jurisdictional approach in developing the Inland Waters Target (instead of a national target). Jurisdictional governments will work in partnership and shared decision making with Aboriginal and Torres Strait Islander Peoples to determine a baseline and their approach to achieving their Inland Waters Target/s.

Northern Territory Commitment not delivered in timeframe in National Agreement

An initial target was agreed at Joint Council in August 2022. Parties have agreed that further work is required and are working to ensure a clear plan towards a new Inland Waters Target.

Queensland Commitment not delivered in timeframe in National Agreement

An initial target was agreed at Joint Council in August 2022. Parties have agreed that further work is required and are working to ensure a clear plan towards a new Inland Waters Target.

South Australia Commitment not delivered in timeframe in National Agreement

On 5 July 2024, Joint Council agreed to a jurisdictional approach in developing the Inland Waters Target (instead of a national target). Jurisdictional governments will work in partnership and shared decision making with Aboriginal and Torres Strait Islander Peoples to determine a baseline and their approach to achieving their Inland Waters Target/s.

Tasmania Commitment not delivered in timeframe in National Agreement

On 5 July 2024, Joint Council agreed to a jurisdictional approach in developing the Inland Waters Target (instead of a national target). Jurisdictional governments will work in partnership and shared decision making with Aboriginal and Torres Strait Islander Peoples to determine a baseline and their approach to achieving their Inland Waters Target/s.

Victoria Commitment not delivered in timeframe in National Agreement

On 5 July 2024, Joint Council agreed to a jurisdictional approach in developing the Inland Waters Target (instead of a national target). Jurisdictional governments will work in partnership and shared decision making with Aboriginal and Torres Strait Islander Peoples to determine a baseline, a jurisdictional target/s and their approach to achieving their Inland Waters Target/s.

Western Australia Commitment not delivered in timeframe in National Agreement

On 5 July 2024, Joint Council agreed to a jurisdictional approach (WA noted this recommendation) in developing the Inland Waters Target (instead of a national target). Jurisdictional governments will work in partnership and shared decision making with Aboriginal and Torres Strait Islander Peoples to determine a baseline and their approach to achieving their Inland Waters Target/s.

Develop a target for community infrastructure 87a July 2021 Target All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Target was agreed at Joint Council December 2021 and endorsed and established by First Ministers in August 2022.

Consider the locations of the six new place-based partnerships 39 July 2021 Priority Reform 1 All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six place-based partnership locations: Tamworth (NSW), Gippsland (Vic), Doomadgee (Qld), East Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Develop first four Sector Strengthening Plans for identified sectors 52 July 2021 Priority Reform 2,
Plan
All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Early Childhood and Health Sector Strengthening Plans in December 2021 and the Housing and Disability Plans in August 2022.

Develop Implementation Plans 111a July 2021 Plan All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

WA’s second Closing the Gap Implementation Plan was published in October 2023.

Establish Data Development Plan 92 July 2022 Plan All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council agreed the Data Development Plan in August 2022.

Review spending to identify reprioritisation opportunities 113 July 2022 Review Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

ALGA is neither a funding provider nor a recipient of any Government funds for CTG activities.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council noted details of Government Parties’ Reviews in June 2023. The Commonwealth, NSW, ACT, NT, SA, VIC and WA have completed their reviews.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council noted details of Government Parties’ Reviews in June 2023. The Commonwealth, NSW, ACT, NT, SA, VIC and WA have completed their reviews.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council noted details of Government Parties’ Reviews in June 2023. The Commonwealth, NSW, ACT, NT, SA, VIC and WA have completed their reviews.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council noted details of Government Parties’ Reviews in June 2023. The Commonwealth, NSW, ACT, NT, SA, VIC and WA have completed their reviews.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council noted details of Government Parties’ Reviews in June 2023. The Commonwealth, NSW, ACT, NT, SA, VIC and WA have completed their reviews.

Queensland Commitment not delivered in timeframe in National Agreement

Queensland has delivered Phase 1 of its Aboriginal and Torres Strait Islander Expenditure Review and confidentially shared investment mapping with Queensland remote and discrete communities.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council noted details of Government Parties’ Reviews in June 2023. The Commonwealth, NSW, ACT, NT, SA, VIC and WA have completed their reviews.

Tasmania Commitment not delivered in timeframe in National Agreement

Joint Council noted details of Government Parties’ Reviews in June 2023. The Commonwealth, NSW, ACT, NT, SA, VIC and WA have completed their reviews.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council noted details of Government Parties’ Reviews in June 2023. The Commonwealth, NSW, ACT, NT, SA, VIC and WA have completed their reviews.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Western Australia will publish its second Aboriginal Expenditure Review (for 2023-24) in 2025.

Consider reviews at Clause 113 114 After July 2022 Review Joint Council ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

ALGA is neither a funding provider nor a recipient of any Government funds for CTG activities.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed.

Queensland Commitment not delivered in timeframe in National Agreement

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed.

Tasmania Commitment not delivered in timeframe in National Agreement

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, NSW, ACT, NT, SA, VIC and WA clause 113 reviews completed. WA’s Aboriginal Expenditure Review was noted by PWG in October 2023, and by Joint Council in November 2023.

Undertake stocktake of partnership arrangements in jurisdictions 36a December 2022 Priority Reform 1,
Review
Government parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Partnership Stocktakes considered by Joint Council December 2022. Western Australian stocktake considered by PWG in October 2023.

Establish a joined up approach to five policy priority areas 38 December 2022 Priority Reform 1,
Plan
Joint Council ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Five Policy Partnerships have now been established. Justice in April 2021, Early Childhood Care and Development and Social and Emotional Wellbeing in August 2022, and Languages and Housing in December 2022.

Review and Strengthen Existing Partnerships 36b December 2023 Priority Reform 1,
Review
Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Commonwealth, ACT, WA, SA and VIC have completed their Jurisdictional Partnership Stocktake. These were provided to Joint Council in November 2023.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC have completed their Jurisdictional Partnership Stocktake. These were provided to Joint Council in November 2023.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Commonwealth, ACT, WA, SA and VIC have completed their Jurisdictional Partnership Stocktake. These were provided to Joint Council in November 2023.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC have completed their Jurisdictional Partnership Stocktake. These were provided to Joint Council in November 2023.

New South Wales Commitment not delivered in timeframe in National Agreement

On 14 February 2024, the NSW Government signed the NSW Closing the Gap Partnership Agreement with NSW CAPO and Local Government NSW, continuing our strong partnership. The Partnership Agreement commits the NSW Government, to shared decision-making about policies that impact Aboriginal people and communities. Together, in partnership, we will continue to drive outcomes in Aboriginal communities across NSW.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The NT completed its jurisdictional partnership stocktake in 2023 and is working with the partnerships subject to the Review, to strengthen them in line with Closing the Gap strong partnership elements. In 2024, this saw three existing policy partnerships formalise into the NT Closing the Gap structure with regular reporting of progress to the NT Executive Council on Aboriginal Affairs on their respective socio-economic outcomes.
The Partnership Stocktake is publicly available.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Queensland has completed its Partnership Stocktake for 2023. This was provided to Joint Council in July 2024.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC have completed their Jurisdictional Partnership Stocktake. These were provided to Joint Council in November 2023.

Tasmania Commitment not delivered in timeframe in National Agreement

Commonwealth, ACT, WA, SA and VIC have completed their Jurisdictional Partnership Stocktake. These were provided to Joint Council in November 2023.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC have completed their Jurisdictional Partnership Stocktake. These were provided to Joint Council in November 2023.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC have completed their Jurisdictional Partnership Stocktake. These were provided to Joint Council in November 2023.

Identify sectors for joint national strengthening effort every three years through Sector Strengthening Plans 49 December 2023 Priority Reform 2,
Plan
All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Productivity Commission Review 121 December 2023 Review Productivity Commission ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

The Productivity Commission’s Review of the National Agreement on Closing the Gap final report was released on 7 February 2024.

Report on Review of Partnerships to Joint Council 36c December 2023 Priority Reform 1,
Review
Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

New South Wales Commitment not delivered in timeframe in National Agreement

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

Northern Territory Commitment not delivered in timeframe in National Agreement

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Queensland provided its Partnership Stocktake for 2023 to Joint Council in July 2024.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

Tasmania Commitment not delivered in timeframe in National Agreement

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Commonwealth, ACT, WA, SA and VIC provided their report on Jurisdictional Partnership Stocktake to Joint Council in November 2023.

Identify, develop or strengthen mechanisms to transform mainstream agencies and institutions 67 December 2023 Priority Reform 3 Government parties ALGA Commitment not delivered in timeframe in National Agreement
Australian Capital Territory Commitment not delivered in timeframe in National Agreement
Coalition of Peaks Commitment not delivered in timeframe in National Agreement
Commonwealth Commitment not delivered in timeframe in National Agreement
New South Wales Commitment not delivered in timeframe in National Agreement
Northern Territory Commitment not delivered in timeframe in National Agreement
Queensland Commitment not delivered in timeframe in National Agreement
South Australia Commitment not delivered in timeframe in National Agreement

In partnership with SAACCON the South Australian government has developed and endorsed co-design definition for engagement with Aboriginal and Torres Strait Islander peoples.
https://www.dpc.sa.gov.au/responsibilities/community-engagement/co-desi…

Tasmania Commitment not delivered in timeframe in National Agreement
Victoria Commitment not delivered in timeframe in National Agreement

Statewide Treaty negotiations commenced with a cultural ceremony on 21 Novemeber 2024. One of the priorities for Statewide Treaty negotiations is implementing the accountability mechanism under the National Agreement on Closing the Gap. This is one pathway to identify, develop or strengthen existing mechanisms.

Western Australia Commitment not delivered in timeframe in National Agreement
Report publicly on transformation of mainstream agencies and institutions 67d December 2023 Priority Reform 3,
Report
Government parties ALGA Commitment not delivered in timeframe in National Agreement
Australian Capital Territory Commitment not delivered in timeframe in National Agreement
Coalition of Peaks Commitment not delivered in timeframe in National Agreement
Commonwealth Commitment not delivered in timeframe in National Agreement
New South Wales Commitment not delivered in timeframe in National Agreement
Northern Territory Commitment not delivered in timeframe in National Agreement
Queensland Commitment not delivered in timeframe in National Agreement
South Australia Commitment not delivered in timeframe in National Agreement

SA Government is exploring opportunities for consistent reporting within Annual Reports across the government.

Tasmania Commitment not delivered in timeframe in National Agreement
Victoria Commitment not delivered in timeframe in National Agreement

Statewide Treaty negotiations commenced with a cultural ceremony on 21 Novemeber 2024. The Victorian Government and First Peoples’ Assembly of Victoria will issue joint updates from the negotiating table to keep Victorians informed about the progress of Treaty negotiations. The Treaty Annual Report will provide a mechanism through which the Victorian Government can report publicly on the work of the State in advancing the Treaty process.

Western Australia Commitment not delivered in timeframe in National Agreement
Agree additional sectors for Sector Strengthening Plans 53 December 2023 Priority Reform 2,
Plan
All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Three additional sectors have been identified for Sector Strengthening Plans; Justice, Aboriginal and Torres Strait Islander Languages; and Family, Domestic and Sexual Violence.

Establish data projects in up to six locations across Australia 74 December 2023 Priority Reform 4 All parties ALGA Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Australian Capital Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Coalition of Peaks Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Commonwealth Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

New South Wales Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Northern Territory Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Queensland Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Tasmania Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Victoria Commitment not delivered in timeframe in National Agreement

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Western Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

Joint Council has agreed six community data project locations: Western Sydney (NSW), Gippsland (Vic), Doomadgee (Qld), Kimberley (WA), western suburbs of Adelaide (SA), and Maningrida (NT).

Provide formal response to review at Clause 121 129 July 2024 Review Joint Council ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Establish six new place-based partnerships across Australia 39 December 2024 Priority Reform 1 All parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Queensland has provided funding to support establishment of a Place-based Partnership for Doomadgee.

South Australia Commitment has been delivered in the timeframe in the National Agreement or within agreed extended timeframes

SAACCON is leading South Australia’s Place-Based Partnership based in the Western Suburbs of Adelaide
The Partnership is in the formation phase, with implementation a priority focus for SA in 2025. South Australia’s Place-Based Partnership Steering Committee held its first meeting in November 2024.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Commitment not delivered in timeframe in National Agreement
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Increase the proportion of services delivered by Aboriginal and Torres Strait Islander organisations, including through funding prioritisation policies 55a December 2024 Priority Reform 2 Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

The Elected Body held public hearings on 2, 3 and 5 April 2024. From these hearings a number of key recommendations were made, and subsequently agreed by the ACT Government, including:
• Progress proportional funding distribution to ACCOs, recognising the work being undertaken by the Community Services Directorate to do this under the Next Steps program.
• The Elected Body identified that they would like to see this happen in housing, justice reinvestment and systemic discrimination.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

A number of South Australian Government agencies have taken steps to deliver on Clause 55.
Agencies continue to work to identify opportunities for ACCOs to deliver government services. Procurement reforms and additional supports are also being considered to better enable delivery of Clause 55.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Increase the proportion of services delivered by Aboriginal and Torres Strait Islander organisations, including through allocating a meaningful proportion of funding to Aboriginal and Torres Strait Islander organisations 55b December 2024 Priority Reform 2 Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

ASD has developed an ACCO Policy to better guide and coordinate whole-of-government efforts to enable and support the ACCO sector. This will cover the planning, management, and delivery of human service programs to Aboriginal and Torres Strait Islander people in the ACT.
The development of an ACCO Policy is an identified action under the ACT Government’s ‘Closing the Gap 2021 Implementation Plan’. Priority 2 directs ‘Community Services Directorate to work in partnership with other directorates to develop a Policy Paper outlining our approach to genuinely partner with ACCOs and businesses to deliver better services and capability’.
Through these efforts, the ACT Government has continued to invest in projects that intend to:
• develop sustainable Aboriginal and Torres Strait Islander community-controlled organisations in the ACT, including for people with disability;
• plan or deliver programs that will benefit Aboriginal and Torres Strait Islander people, including children and families; and
• improve data and information to the benefit of Aboriginal and Torres Strait Islander people; and Supporting efforts towards Truth Telling in the ACT.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

A number of South Australian Government agencies have taken steps to deliver on Clause 55.
Agencies continue to work to identify opportunities for ACCOs to deliver government services. Procurement reforms and additional supports are also being considered to better enable delivery of Clause 55.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Aboriginal and Torres Strait Islander-led Review 125 February 2025 Review Coalition of Peaks ALGA Commitment not delivered in timeframe in National Agreement
Australian Capital Territory Commitment not delivered in timeframe in National Agreement
Coalition of Peaks Commitment not delivered in timeframe in National Agreement
Commonwealth Commitment not delivered in timeframe in National Agreement
New South Wales Commitment not delivered in timeframe in National Agreement
Northern Territory Commitment not delivered in timeframe in National Agreement
Queensland Commitment not delivered in timeframe in National Agreement
South Australia Commitment not delivered in timeframe in National Agreement
Tasmania Commitment not delivered in timeframe in National Agreement
Victoria Commitment not delivered in timeframe in National Agreement
Western Australia Commitment not delivered in timeframe in National Agreement
Provide formal response to review at Clause 125 129 August 2025 Review Joint Council ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Consider Progress on Priority Reform 1 and make additional partnership actions if needed 41 December 2025 Priority Reform 1,
Review
All parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Consider Progress on Priority Reform 2 and make additional partnership actions if needed 57 December 2025 Priority Reform 2,
Review
All parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Consider Progress on Priority Reform 3 and make additional partnership actions if needed 68 December 2025 Priority Reform 3,
Review
All parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Consider Progress on Priority Reform 4 and make additional partnership actions if needed 77 December 2025 Priority Reform 4,
Review
All parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Productivity Commission Review 121 July 2026 Review Productivity Commission ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Identify sectors for joint national strengthening effort every three years through Sector Strengthening Plans 49 December 2026 Priority Reform 2,
Plan
All parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Provide formal response to reviews at Clauses 121 & 125 129 July 2027 Review Joint Council ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Aboriginal and Torres Strait Islander-led Review 125 July 2027 Review Coalition of Peaks ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Productivity Commission Review 121 January 2029 Review Productivity Commission ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Identify sectors for joint national strengthening effort every three years through Sector Strengthening Plans 49 December 2029 Priority Reform 2,
Plan
All parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Aboriginal and Torres Strait Islander-led Review 125 July 2030 Review Coalition of Peaks ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Provide formal response to reviews at Clauses 121 & 125 129 July 2030 Review Joint Council ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Include in annual report – information on partnerships 37 Annually Priority Reform 1,
Report
Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

National Agreement on Closing the Gap – South Australia’s Annual Report 2023-2024 – Published 15 November 2024.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Include in annual report – information on strengthening the community-controlled sector 47 Annually Priority Reform 2,
Report
Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

National Agreement on Closing the Gap – South Australia’s Annual Report 2023-2024 – Published 15 November 2024.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Include in annual report – information on the transformation elements 65 Annually Priority Reform 3,
Report
Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

National Agreement on Closing the Gap – South Australia’s Annual Report 2023-2024 – Published 15 November 2024.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Include in annual report – information on action taken to improve access to data and information 73 Annually Priority Reform 4,
Report
Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

National Agreement on Closing the Gap – South Australia’s Annual Report 2023-2024 – Published 15 November 2024.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Include in annual report – information drawn from the dashboard and annual Productivity Commission data compilation report 118a Annually Report Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Include in annual report – information on efforts to implement four Priority Reform areas 118b Annually Report Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Include in annual report – information on how efforts, investment and actions are aligned and support achievement of CTG 118c Annually Report Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Include in annual report – list of names of organisations that have been allocated funding 118d Annually Report Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Information on this clause to be included in Parties annual reports, to table by September each year.

Develop and maintain a publicly accessible dashboard updated regularly 116 Annually Data,
Report
Productivity Commission ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Dashboard developed and available
(https://www.pc.gov.au/closing-the-gap-data/dashboard)
Last updated March 2024.

Develop an Information Repository 117 Annually Data,
Report
Productivity Commission ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Annual Update to Parties to the National Agreement 131 Annually Report Joint Council ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due

Joint Council considers implementation progress and areas for further joined up effort at their last meeting of the calendar year starting in 2022.

Implement data and information elements 72 Ongoing Priority Reform 4,
Data
Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Share and publish engagement approaches that give effect to the transformation elements on engagement 63 Ongoing Priority Reform 3,
Review
Government parties ALGA Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Australian Capital Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Coalition of Peaks Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Commonwealth Due date for commitment has not yet arrived. Work may have started but the action is not yet due
New South Wales Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Northern Territory Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Queensland Due date for commitment has not yet arrived. Work may have started but the action is not yet due
South Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Tasmania Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Victoria Due date for commitment has not yet arrived. Work may have started but the action is not yet due
Western Australia Due date for commitment has not yet arrived. Work may have started but the action is not yet due